Panelised System
STEP 1. DESIGN & CONSULT
- Provide us with your detailed construction plans
- Collaborate on the details of your project. Framewayz will work to achieve the most efficient result
STEP 2. MODEL & PRICE
- We will model your building in the integrated software and provide a quote for the works.
STEP 3. QUOTE ACCEPTANCE
- On acceptance of the quote we will provide you with the design documentation of the framework to be lodged as part of your development approval application.
STEP 4. PRE BUILD CONSULT
- Before production of the Framewayz structure we sit down together and run through the intricate details on the job.
STEP 5. PRODUCTION SCHEDULE
- Provide us with the date that the foundation is due to be done and we will book installation
- Using “Just in time” principles all panels and components are put into the production schedule.
STEP 6. TRANSPORT
- The Framewayz panelised structure is delivered to site ready for installation
STEP 7. ASSEMBLY
- Framewayz will install the structure in accordance with the quality assembly process
- Framewayz include crane hire to install the quoted structure
- Framewayz include personal access equipment to install the quoted structure
STEP 8. HANDOVER
- A detailed checklist will be provided confirming all components have been correctly installed as per the Framewayz engineered model