Framewayz worked with the builder from the planning stage to ensure the two storey timber frame could be installed on site within days. Utilising, open panel internal walls, zero-lot boundary wall and floor cassettes. This project resulted in; reduced build time, reduced scaffold costs and was delivered within time & on budget.

Day 1 - Delivery & install of lower wall frame
Day 1 - Delivery & install of lower wall frame
Day 1 - Delivery & install of lower wall frame
Day 1 - Delivery & install of lower wall frame
Lower wall frame installation
Lower wall frame installation
Floor cassettes installed within hours
Floor cassettes installed within hours
Floor Cassette Install
Floor Cassette Install
Upper wall frame
Upper wall frame