This large two storey home was installed on site within days. The external upper storey walls were pre-fabricated and clad in the Framewayz factory and installed on site within hours. This method significantly reduced build time & scaffold costs.
![Wall framing is fabricated precisely in the factory](https://www.framewayz.com.au/assets/gallery/_resampled/CroppedFocusedImageWzYwMCw0MDAsInkiLDI1XQ/CompressedImageW10/factoryframe1.jpg)
![First floor walls are fabricated and clad in the Framewayz factory](https://www.framewayz.com.au/assets/gallery/_resampled/CroppedFocusedImageWzYwMCw0MDAsInkiLDI1XQ/CompressedImageW10/factoryframe2.jpg)
![Panels are delivered to site on Day 1](https://www.framewayz.com.au/assets/gallery/_resampled/CroppedFocusedImageWzYwMCw0MDAsIngiLDJd/CompressedImageW10/Siteday1.jpg)
![Wall panels installed on site](https://www.framewayz.com.au/assets/gallery/_resampled/CroppedFocusedImageWzYwMCw0MDAsZmFsc2UsMF0/CompressedImageW10/Siteday1-b.jpg)
![Wall panels continue to be installed on day 1](https://www.framewayz.com.au/assets/gallery/_resampled/CroppedFocusedImageWzYwMCw0MDAsInkiLDZd/CompressedImageW10/Siteday1-c.jpg)
![Floor frame is fabricated into cassettes in the factory and craned into position on site](https://www.framewayz.com.au/assets/gallery/_resampled/CroppedFocusedImageWzYwMCw0MDAsInkiLDEwMF0/CompressedImageW10/Siteday2a.jpg)
![First floor walls delivered to site fully clad & craned into position on day 3](https://www.framewayz.com.au/assets/gallery/_resampled/CroppedFocusedImageWzYwMCw0MDAsZmFsc2UsMF0/CompressedImageW10/Siteday3.jpg)
![Roof trusses are installed on site on day 4 & 5](https://www.framewayz.com.au/assets/gallery/_resampled/CroppedFocusedImageWzYwMCw0MDAsIngiLDUzXQ/CompressedImageW10/Siteday3b2x.jpg)
This large two storey home was installed on site within days. The external upper storey walls were pre-fabricated and clad in the Framewayz factory and installed on site within hours. This method significantly reduced build time & scaffold costs.